TYRVAQ
All ecosystem assets

Intelligence, authority & recovery

Design stage / bench plan unmeasured

PERSISTENT ENERGY ARCHITECTURE

Qualified recovery & trust continuity

Perpetual recoverability, not perpetual energy.

PERSISTENT ENERGY ARCHITECTURE illustrative system concept
Interface illustration · conceptual states, not live telemetry

FIELD DOSSIER / TQ-23

Energy / trusted recovery

HOST-BASED SYSTEM
Physical mass
Included in host
Physical size
Domain dependent
Deployment
CORE + asset power domains

Energy architecture spans storage, power isolation and recovery state.

Components need a host-specific BOM; no universal module weight or footprint is established.

SPEC v0.2 / 2026-10-08NO SEPARATE ENCLOSURE
01

Fail downward, recover deliberately

The normal proposed path is Active → Conserve → Critical → Dormant → Accumulate → Qualify → Bootstrap → Reconstitute → Active. Loss of Layer-0 trust continuity instead enters Blackout and requires reconstruction.

02

Stage-gated qualification

Revision C checks energy, source persistence, bus voltage, temperature, initial identity/state and retreat readiness before boot. Bootstrap separately checks bus/storage alignment and the full persistent, policy and ASSET state before reconstitution.

03

Afford the transition and the retreat

The usable, guaranteed energy must cover the bounded worst-case boot and verification costs with margin, plus Layer-0 survival and the mechanical safe-state reserve. Transient voltage stability matters independently of total stored energy.

04

Harvesting is measured input

When stored energy alone covers the complete transition, ignore possible future input. Otherwise qualify conservative persistent input over a defined window. Accumulate requires positive net input after survival loads and losses. The small dormant-current budget is a bench target, not a measured result.

05

The validation record

The current PEA validation log records a design-stage bench plan, with no prototype measurements and no H00 or T01 pass. Dormant current, brownout response and qualification margins remain design targets; they must not be presented as demonstrated results.

Connected roles

View architecture